Project - 1 x 630 amp sub main 140m from the main panel board to a central distribution position within the factory and to re-terminate three of the existing MCCB's on the panel board.
Challenge - To make way for the new 630 amp MCCB breaker in the main intake panel board that had no spare ways, install 3 x 95mm 4 core XLPE SWA cables and earth wire, above an office suspended ceiling, through a process hall then up to a height of 7m, running 70m then down to a MEM panel board. At the intake position to then terminate the 3 x 95mm's into a gland plate with no seemingly spare space.
Method - Intake position, take out a redundant supply contactor, link in the 630 amp MCCB with flexible busbar, re-terminate the 3 existing MCCB's. Cut large holes in the walls along the route, protect with carpet, install heavy duty cable tray. Pull in cables over a weekend. Dress cables onto the tray. Terminate the cables in the intake position by repositioning some existing circuits. Terminate the load end.
Result - The sub main was installed and the client was very satisfied with the work and how it was carried out.