Barfoots of Botley

Project - 1 x 800 amp sub main & 1 x 630 amp sub main 140m from the main distribution point.

Challenge - To install the two sub mains under a concrete apron that was being used 24/7.

Method - To cut half the concrete, lay in the duct, back fill then cut the remaining section. Once the duct had been installed a 110m trench was dug to the new distribution position. The cables were then pulled through the duct and layed into the trench. The cables were terminated into MEM Panel Boards.

Result - The sub mains were installed, with no stoppage to the lorry traffic, thus giving the client an electrical infrastructure throughout in processing plant.


Images - Click to enlarge

Cables pulled through the duct individually with our Trifor winchAs the cables were pulled in they were supported by our 6 ton cable jacks
This is about the easiest way to install cables in a trench, if you have clear access